Dispatchers taking calls and tracking loads in a trucking company office

How to quote a load

How to quote a load: a trucking rate quote from your own costs

Prashant Chandra · Published

How to quote a load comes down to one rule: a trucking rate quote starts from what the load costs your truck, not from what other carriers charge. The method takes five parts:

  • Count every mile: the loaded miles, plus the empty miles to the pickup and, if the delivery city has few loads out, part of the trip home.
  • Count the time: loading, waiting, driving and the border, because a truck that sits still still costs money.
  • Price both: your running cost for each mile, and your fixed cost for each day the truck is tied up.
  • Add your margin and set a floor: the lowest number you will take, decided before the broker calls.
  • Write the terms: what the rate covers, free time, extra charges and when the quote runs out.

Once your own costs are on paper, a quote takes minutes, not guesses.

What does it mean to quote a load?

To quote a load is to give a broker or shipper one price to move one load from A to B. The broker may take your number, push back, or book someone else. Nothing is agreed until a rate confirmation is signed.

Most quotes start with a rate request. Our rate request email template covers how to read the request and how to word the reply. This page is about the number in that reply: where it comes from, and how to know it pays.

A small office often quotes from memory: "that lane is usually about this much." That works until fuel, repairs or empty miles change, and the memory does not. A quote built from your own costs tells you, every time, whether the load makes money. For how an office can answer rate requests at your rate within minutes, see our dispatch page.

What do you need before you quote a load?

Have these six numbers ready before the first request of the day. Most come from your own books, and you only work them out once a month or so.

  • The miles. Loaded miles from pickup to delivery, and the empty miles to reach the pickup.

  • The time. How many days or hours the truck is tied up, from leaving for the pickup to being free for the next load.

  • Your running cost per mile. The costs that go up with every mile: fuel, tires, repairs and upkeep.

  • Your fixed cost per day. The costs you pay even when the truck is parked: truck and trailer payments, insurance, plates, permits and the office.

  • Driver pay. By the mile, by the hour or by the load, however your drivers are paid. If you drive yourself, pay yourself here.

  • Load extras. Tolls, permits, border costs and anything else this one load needs.

Use miles or kilometres, whichever your books use, but use the same one everywhere. Mixing them is one of the easiest ways to quote a load wrong.

How to quote a load, step by step

  1. Read the request twice. Lane, dates, equipment, weight and any special needs. If something is missing, ask before you price.
  2. Count all the miles. Empty miles to the pickup, plus loaded miles. If the delivery city sends few loads out, add part of the trip home.
  3. Count the days. Loading, waiting, driving, the border and unloading. Round up to the time the truck is really tied up.
  4. Price the miles. All the miles times your running cost per mile, plus driver pay.
  5. Price the days. The days times your fixed cost per day.
  6. Add the extras. Tolls, permits and border costs for this load.
  7. Add your margin. The profit you want on top of cost. Costs are what keep the truck running; margin is what keeps the business.
  8. Check it against your floor. If the broker cannot pay at least your floor, say no politely and keep the truck for a better load.

The steps take longer to read than to do. Once your cost numbers are on one sheet, most quotes are a few lines of arithmetic.

Trucking rate quote: a worked example

These are made-up round numbers to show the method. They are not a rate to use and not an average. Put in your own.

Say a broker asks for a price on 400 loaded miles. Your truck is 50 miles from the pickup, and the load ties the truck up for 2 days, counting loading and waiting.

Trucking rate quote: a worked example
LineExample arithmeticExample amount
All the miles50 empty + 400 loaded = 450 miles450 miles
Running cost450 miles × $1.00 a mile$450
Driver pay450 miles × $0.50 a mile$225
Fixed cost2 days × $300 a day$600
ExtrasNo tolls or permits on this load$0
Total cost$450 + $225 + $600 + $0$1,275
MarginThe profit you chose for this load$225
Quote$1,275 + $225$1,500

Look at two things in this example. First, the fixed cost is the biggest line. A load that holds the truck an extra day costs more than one that runs a few more miles. Second, $1,500 over 400 loaded miles is $3.75 a loaded mile ($1,500 ÷ 400), but over all 450 miles it is about $3.33 a mile ($1,500 ÷ 450). If you only think in loaded miles, the empty miles hide inside your rate and get forgotten.

Why does time matter as much as miles?

A truck waiting at a dock burns no fuel, but the payment, the insurance and the driver's day keep running. That is why the example above prices days as well as miles.

Waiting also eats driving time. Under Canada's federal hours of service rules (SOR/2005-313), time spent waiting while a truck is loaded or unloaded counts as on-duty time. A long wait at the pickup can mean the driver runs out of hours before the delivery, and the load takes a day longer than you planned.

Waits are common. In ATRI's 2024 survey of US drivers and carriers, drivers were held for more than 2 hours at 39.3 percent of stops in 2023. So when you quote a load, ask about the appointment times, and decide how much free time your rate includes before detention starts.

  • Loading and unloading
  • Waiting at the dock
  • The border
  • Drive back to the next load

What goes on the quote besides the rate?

A number alone invites arguments later. Send the rate with its terms, so the broker can copy them onto the rate confirmation:

What goes on the quote besides the rate?
TermWhat to write
What the rate coversAll in, or line haul plus fuel. If all in, say which extra charges are still billed on top
Currency and taxCanadian or US dollars, and whether HST or GST is extra
Free timeHow many hours at each stop before detention starts
Extra chargesDetention by the hour, layover, TONU, lumper at cost with a receipt, extra stops
The truckWhere it is empty and when
ExpiryThe time and date the quote runs out

On free time, ATRI's 2024 survey found that 67 percent of US carriers that charge detention start at 2 hours. Whatever your terms are, the point is to write them down. For the full list, see the extra charges a carrier can bill, and use the detention calculator to see what a wait is worth at your own rate.

What is your floor rate, and why set it first?

Your floor is the lowest price you will take for a load. Work it out before the broker calls, not during the call.

A simple floor is your total cost for the load with no margin. Below it, you lose money on every mile. Some carriers take a load near the floor when it moves the truck toward a better lane or home, and that can be a good choice. The point is to know you are making it.

When a broker comes back lower than your quote, you have three honest answers: hold your number, meet in the middle if it is still above your floor, or say "we cannot do this one" and keep the truck free. All three keep the broker sending you requests. Silence does not.

  • Above your quote: take it
  • Between floor and quote: your call
  • Below your floor: say no

Should you quote from market rates?

Market rate numbers from load boards and reports show what loads have been paying on a lane. They are useful as a check, after you know your own cost. They are a poor place to start.

A market number is an average of other carriers' loads, trucks and costs. It does not know your truck payment, your fuel, your empty miles or how long this shipper makes drivers wait. Quote from the market alone and you can win loads that lose money, or lose loads you could have run at a profit.

Start from your cost, add your margin, then look at the market. If the market is well above your number, you may be pricing too low. If it is well below, that lane may not be one for your truck this week.

Where do quotes go wrong?

  1. Empty miles

    Quoted on loaded miles only, so the drive to the pickup is free.

  2. Time

    A two-day load priced like a one-day load because only the miles were counted.

  3. The border

    Currency not stated, or border wait and costs left out.

  4. Terms

    Free time and extra charges never written down, so detention is a fight later.

  5. Old costs

    A cost sheet from last year, before fuel or repairs went up.

Each of these is fixed the same way: keep one cost sheet, update it every month, and quote from it every time.

How can a small office quote every load fast?

  1. One cost sheet. Running cost per mile, fixed cost per day and driver pay, updated monthly.
  2. A lane sheet. Your worked-out rate and floor for each lane you run often.
  3. A saved reply. The rate, the terms and the expiry in one template.
  4. A count each day. Requests in, quotes out, loads won. It shows which lanes and brokers pay.

To see what slow or missed quotes cost you, put your own numbers into the missed quote calculator. When the inbox gets busier than one person can price, dispatch and quote automation drafts each reply from your lane sheet for a dispatcher to check. A lane with no rate on the sheet always goes to a person.

Questions about quoting a load

How do you quote a load in trucking?
Count all the miles, including empty miles to the pickup, and the days the truck is tied up. Multiply by your own running cost per mile and fixed cost per day, add driver pay and extras, then add your margin.
What is a trucking rate quote?
The price a carrier offers a broker or shipper to move one load, with its terms: what the rate covers, free time, extra charges and when the quote expires.
Should I quote by the mile or by the load?
Brokers usually want one price for the load. Work it out from your costs by the mile and by the day, then give the total.
Do I charge for empty miles?
Not as a separate line, usually, but your rate should cover them. Count the empty miles to the pickup in your cost, and part of the trip home if the delivery city has few loads out.
How do I work out my floor rate?
Start with your total cost for the load with no margin. Below that number you lose money. Decide it before the broker calls.
Should I use market rates to quote a load?
Use them as a check after you know your own cost, not as the starting point. A market number is an average of other carriers, not your truck.
What should a quote say besides the price?
Whether it is all in or line haul plus fuel, the currency and tax, free time at each stop, extra charges such as detention and TONU, where the truck is, and when the quote runs out.
How long should a quote stay good?
No rule sets it. Give a time and date in the quote, short enough that fuel and your trucks have not changed by then.
Is a quote a contract?
Usually the signed rate confirmation is what sets the terms for the load, not the quote. Check that it matches your quote before the truck moves. This is general information, not legal advice.

Sources

Dispatch and quote automationMissed quote calculatorRate request email: templates to reply fastRate confirmation: what to check before signingAccessorial charges in truckingDetention calculator

Count your missed rate requests, free

(888) 800-8123

We use it only to call you back about your request.

Last reviewed: November 2026. Facts checked November 26, 2026.